
Total EnergyRecovery
Engineering for energy-efficient buildings and industry:
design, equipment supply and construction supervision
A full-cycle company
Total Energy Recovery LLC is part of the Eco-Engineering group of companies, which has been designing and building internal engineering systems for projects of all levels of complexity since 2007. The company's top priority is introducing technologies that are environmentally friendly and save energy. Our goal is lower operating costs, stability, independence and sustainable development for our clients.
We guarantee that our work will reduce the fuel and energy used to run your buildings. The technologies we install pay for themselves many times over and bring you additional income.
We stand for the rational use of the planet's natural resources.
We never stop at what we have achieved!
Learn more
Site survey
We always collect the initial data for every new project. For an existing building we assess its technical condition and main elements to see whether modernization, repair or reconstruction is feasible.
Result
Completed equipment questionnaires and a design brief, on which the commercial proposal is based.

Commercial proposal
The proposal is a structured document with everything you need to decide on working with us: the cost of equipment and services, delivery or completion times, payment terms and warranty.
Result
The proposal shows clearly what you gain from our offer.

Design and approval
At the design stage we develop the technical solutions and prepare the design documentation: explanatory note, drawings and specification. At the approval stage the design is checked by the supervisory authorities for compliance.
Result
You receive a complete, approved set of design documentation for the relevant sections.

Equipment supply
Our specialists handle the whole process for you: purchasing, transport from the factory, insurance, customs clearance and, where required, certification and declaration of the cargo, and delivery to your warehouse or site.
Result
You receive the equipment and goods intact, with an official warranty.

Construction and installation
Our staff includes qualified and certified specialists who carry out construction work and install building services and process equipment. The work is divided into construction and installation.
Result
The end result is a finished building or structure with installed engineering networks and equipment.

Commissioning
After installation, an important stage is preparing and carrying out individual tests and integrated testing of the equipment. This is fine, detailed adjustment of the installed equipment before it is put into operation.
Result
The installed equipment is tested and adjusted, and an individual test certificate is signed. The facility is then ready for operation.

Monitoring and maintenance
We monitor systems with digital twins: observation, analysis and forecasting. This allows timely maintenance and replacement of consumables and minimizes the risk of breakdowns.
Result
Qualified service engineers keep an eye on your equipment, extending its life and improving its efficiency.
Why choose us
of history
Since 2007 the Eco-Engineering group, which Total Energy Recovery LLC is part of, has been designing and building energy-efficient engineering systems. In that time the group has completed more than 500 projects in Uzbekistan and Belarus: heat pumps, heat recovery, solar power plants and climate equipment. We keep growing and developing. We cover the full cycle: design, supply, installation, commissioning and service of our systems. Total Energy Recovery is a look into the future!
Learn moreCompleted projects
Uzbekistan and BelarusOur projects operate in Uzbekistan and Belarus. We work in line with all building codes and environmental safety standards. Total Energy Recovery LLC constantly develops and improves its services. We use modern heat recovery technologies and equipment, introduce renewable energy sources and apply the experience and knowledge of our specialists. We offer our clients individual and integrated solutions.
Learn moreGenerated in 2026
71 solar plants under our monitoring, as of 08.10.2026Our own performance monitoring platform lets decision makers confirm that investments are justified and see the real payback periods of the systems. The platform is an in-house product that we offer clients and partners as proof of how effective modern technologies are. We guarantee that our work will reduce the fuel and energy used to run your buildings. The technologies we install pay for themselves many times over and bring you additional income.
Learn moreOnline calculator
Compare what it costs to heat water with district heating, an electric boiler, a gas boiler and a heat pump at current Uzbek tariffs.
Enter the volume of water and the temperatures and, if needed, the efficiency of the equipment, and get the cost in sum excluding VAT. Tariffs are filled in by default; sources and dates are shown in the calculator.
For an exact equipment selection, an engineer will calculate your building.

The technical effect becomes part of ESG reporting
For every measure we record the baseline, the calculation method and the monitoring indicators. That is how energy savings become verified emission reductions.
Heat pumps
lower fuel use and Scope 1 emissions
Solar, BESS and load management
less purchased electricity and Scope 2 emissions
Heat recovery
lower specific energy consumption
Monitoring and automation
measured data for MRV and verification
7G Carbon Platform
Engineering data from the project goes to the 7G digital platform for corporate emissions accounting, Project MRV, CBAM and registries. Total Energy Recovery is responsible for the methodology and calculations.
ESG consulting and industrial decarbonization
We build on engineering practice: we calculate emissions, define technical measures, assess the economics and track the actual result.
From carbon footprint to measurable CO₂e reduction
One route for the company: initial data, base year, Scope 1–3 calculation, decarbonization program, engineering implementation, monitoring and reporting.
Choose an ESG serviceEnergy saving and environmental modernization
- PD-70Presidential Decree, 29.04.2026
Sets national energy-saving targets.
Learn more - CM Resolution No. 242Cabinet of Ministers Resolution, 14.05.2026
Turns the targets into specific indicators and technical measures.
Learn more - CM Resolution No. 230Cabinet of Ministers Resolution, 15.04.2025
Adds environmental certification of production processes to modernization.
Learn more
Heat recovery, heat pumps and better thermal performance of the building envelope are not only ways to cut operating costs but practical engineering solutions that help implement Uzbekistan's state policy on energy saving and environmental modernization.
Projects and results

Private housePrivate house
Prilukskaya Sloboda, Minsk district (Belarus)Prilukskaya Sloboda, Minsk district (Belarus)

Shopping centerShopping center
318.6 MWh of clean energy a year from recovered heat.318.6 MWh of clean energy a year from recovered heat.

REHAU AWADUKT THERMOREHAU AWADUKT THERMO
Zero energy use for cooling and heating.Zero energy use for cooling and heating.
Send a request
Answer a few questions and get a detailed consultation from our engineers.
Contact us
Fill in the contact formFill in the contact form
Contacts
We are always ready to answer your questions
and offer the best engineering solutions
for your project




